Stonehenge road closed permanently today

24 06 2013
A stretch of road running next to Stonehenge will close permanently from today. Part of the A344 in Wiltshire almost touches the heel stone. English Heritage which manages the monument says the road spoils the visitor experience.

A major landscaping project should be finished by next summer, and traffic will be diverted onto nearby roads instead.

Existing A344 and junction with A303 at Stonehenge Bottom

Existing A344 and junction with A303 at Stonehenge Bottom

Link: http://www.itv.com/news/west/update/2013-06-24/stonehenge-road-closed-permanently/

TRAFFIC NEWS:
A344 Stonehenge, both ways between B3086 and A303

A344 Wiltshire – A344 in Stonehenge closed in both directions between Airmans Cross and Stonehenge Fork, because of development of the Stonehenge site – permanent closure. Diversion in operation – via A360 Longbarrow roundabout.

Main Changes at Stonehenge

  • The A344/A303 junction will be closed
  • The A344 from Stonehenge Bottom to Byway 12 near the stones will be closed
  • Vehicular traffic on the A344 between Byway 12 and the new visitor centre at Airman’s Corner will be restricted

Modifications to Existing Routes   

Alongside these changes there will be measures to mitigate the impact of the closure of the A344. Traffic removed from the 344 will be directed along the A360 via Longbarrow Roundabout and Airman’s Corner junctions, both of which will be modified to accommodate the re-directed traffic.

The A303/A344 junction is a renowned accident black-spot; its closure will reduce the risk of accidents in this location and was strongly supported by local residents in the public consultation of 2008.

Link: http://www.english-heritage.org.uk/daysout/properties/stonehenge/our-plans/our-proposals/transportation-and-safety/

Merlin @ Stonehenge
The Stonehenge News Blog





Stonehenge News Flash: Stonehenge byways to remain open

22 11 2011

A PLANNING inspector has ruled that byways surrounding Stonehenge will remain open.

The decision follows inquiries into proposals to close the byways as well as parts of the A344 and the inspector has decided that although the road will close, the byways should remain open.

English Heritage plans to return the area to grass as part of plans for a new visitors’ centre at Airman’s Corner.

Planning inspector Alan Boyland said: “I accept that Wiltshire has a considerably greater length of byways than any other county. This is not however, in itself, a reason for allowing a further loss for recreational motor vehicle users.

“In this case, the loss of a further 7km, particularly given the strategic importance of those routes, and without similar alternative routes being available, would in my view be significantly detrimental to the current users.”

At the inquiry, Druid leader King Arthur Pendragon objected to the proposals to close the byways as he said it is a violation of his human rights not to be able to access the area, particularly during Pagan ceremonies such as celebrations of the solstices and equinox.

Mr Pendragon said: “It appears that the inspector has erred on the side of common sense and found himself in agreement with the points made.”

The new visitor centre has got planning permission and despite funding problems English Heritage hopes the it can be completed by 2013.

Article: http://www.salisburyjournal.co.uk/news/salisbury/salisburynews/9378111.Stonehenge_byways_to_remain_open/#commentsList

Sponsored by The Stonehenge Tour Company – www.StonehengeTours.com

Merlin @ Stonehenge








%d bloggers like this: