A tunnel past Stonehenge will be dug largely along the route of the existing A303, the government has announced.

12 09 2017

Stonehenge tunnel route altered to protect winter solstice view

Previously it was planned to go south of the stones but there were concerns this would intrude on the view of the setting sun at the winter solstice.

How Stonehenge could be viewed if the tunnel is built

Historic England, the National Trust and English Heritage said “if designed with care”, this would “restore peace and tranquillity” to the landscape.

But campaign groups have called for a “complete rethink” to the plan.

They fear the work will mean the area will lose World Heritage Status after Unesco, the organisation that decides on such sites, said the tunnel should be “reconsidered”.

Unesco has previously backed the option for a bypass to be built.

What is new in this plan?

  • A tunnel that is “at least” 1.8m (2.9km) long beneath the World Heritage site
  • The western tunnel entrance will move 50 metres further away from the stones
  • A new bypass to the north of Winterbourne Stoke
  • A new flyover at the Countess Roundabout – on the eastern side of the tunnel
  • Junctions to the A345 and A360 at either end of the tunnel

Read the full story in on the BBC NEWS website

The Stonehenge News Blog
Follow us on Twitter and Facebook for all the latest Stonehenge News
http://www.Stonehenge.News


Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s




%d bloggers like this: